Generic pharmaceuticalsAnonymizedFilm · 2 min

The dispute window closes before we check the line

Model N cleared most of the chargeback lines a generics maker’s wholesalers claimed on their 844s, but the rest waited in an exception queue worked by hand in Excel, and the dispute window closed on lines nobody had checked. We redesigned that work first, with one owner for the contract eligibility master, every invalid line disputed inside the window with its evidence and a monthly gross to net review, then built an agent that checks each line Model N couldn’t clear and drafts the 849 response and the dispute packet for a contract analyst to approve.

Anonymized client. Figures are illustrative.

Chapters

At a glance

The situation, and what we did

Situation
A generics maker of sterile injectables sells through wholesalers to hospitals on GPO contracts, and its wholesalers send their 844 chargeback claims through its EDI provider into Model N. Model N cleared most lines against the contracts and rosters it holds, but the lines it couldn’t settle waited in an exception queue worked by hand in Excel, and the dispute window in the maker’s wholesaler agreements closed on lines nobody had checked.
Mandate
Inside the dispute window, check every line Model N can’t clear and dispute the invalid ones with their evidence, and see what each product really nets, contract by contract, with the same team.
Our role
We redesigned the work around Model N first, then built the tables, the exception checker and the approval queue in the company’s own Azure tenant. Model N stays the record, and a contract analyst resolves each line in it herself.
What we did
Gave the contract eligibility master one owner, made it the rule that every invalid line is disputed inside the window with its evidence, and set a monthly gross to net review by product, customer and contract. Then built an agent that checks each line Model N couldn’t clear and drafts the 849 response and the dispute packet, which a contract analyst approves before she resolves the line in Model N herself.

As redesigned

The redesign, process first

  1. One owner for the contract eligibility master, with its GPO rosters, class of trade, contract dates and prices.

  2. Every invalid line disputed inside the window, with its evidence.

  3. A monthly gross to net review by product, customer and contract, with the director of contract administration and the CFO.

As built

The systems in this case

What the team runs

  • Model NModel N
  • The EDI provider

What we build

  • Microsoft FabricTables in Microsoft Fabric
  • The exception checker
  • The approval queue

What people read

  • Power BIPower BI, on the same tables

Product names and logos are trademarks of their respective owners.

The agent, and who approves it

Agent
Exception checker
Drafts
the 849 response for each line Model N couldn’t clear, and the dispute packet with its evidence
Owner
the director of contract administration
Measure
lines validated, and disputed where invalid, inside the window
Approver
a contract analyst, every rejection and dispute
May not
send anything to a wholesaler, accept or reject a line, or change a contract, price or roster

The measure

What we measure

Lines validated, and disputed where invalid, inside the window, read line by line from the dispute log, with each dispute tracked until it closes. Beside it, gross to net per unit by product, customer and contract, reviewed every month by the director of contract administration and the CFO.

Chargeback and volume-allowance provisions of $3.16B against $2.38B of net revenue.

Source: Amneal 10-Q, nine months to 30 Sep 2026. One large maker, for scale.

More work

Other engagements

Next step

Bring us a situation

If you run a company like this one, back one or lend to one, a principal replies within one business day and holds a first call.

Bring us a situation