The batch is finished. The investigation isn’t.

At a small sterile fill-finish CDMO, the sterility test’s days were fixed, but the days after its last result went to chasing a deviation still open, a lab result sitting in another system and an unsigned step, one at a time. We redesigned the work around the test first, so the chase runs while the test does, then built two agents beside the systems the team already runs, which list and draft while QA still decides every batch in MasterControl.

Anonymized client. Figures are illustrative.

Chapters

At a glance

The situation, and what we did

Situation
A small sterile fill-finish CDMO runs deviations, batch records and disposition in MasterControl, lab and environmental-monitoring results in a LIMS, and lots and stock in its ERP. The sterility test’s days were fixed, but after the last result each batch with a deviation still waited on an organism ID that sat in the LIMS, an unsigned step found by reading every line and an investigation report QA sent back, while the customer kept asking what it was waiting on.
Mandate
Run the chase while the sterility test runs, without hurrying the test, and leave every batch decision with QA in MasterControl, with the same QA team and the systems it already runs.
Our role
We redesigned the quality team’s work around the sterility test first. Then we built a read-only layer and two agents beside the systems the team already runs, in the company’s own Azure tenant.
What we did
Made a risk class within one shift the rule for every deviation, redesigned the batch records against the known causes of entry errors, moved QA’s batch record review to the exceptions MasterControl flags and the critical parameters, and started a daily release meeting off one board that shows each held batch, what’s open and whose it is. Then built a batch packet agent that lists what each held batch is missing, and a deviation triage agent that drafts a risk class and an outline for the investigator to accept or change; nothing writes back, and QA decides every batch in MasterControl.

As redesigned

The redesign, process first

  1. Every deviation gets a risk class within one shift.

  2. Batch records are redesigned against the known causes of entry errors, and QA reviews what MasterControl flags and the critical parameters, not every line.

  3. Every morning, the release meeting reads one board, with each held batch, what’s open and whose it is.

As built

The systems in this case

What the team runs

  • MasterControlMasterControl
  • LIMS
  • ERP

What we build

  • Microsoft FabricRead-only tables in Microsoft Fabric, joined by batch and time
  • Azure OpenAIThe batch packet and deviation triage agents, on Azure OpenAI

What people read

  • Power BIThe daily release board in Power BI, information only

Product names and logos are trademarks of their respective owners.

The agent, and who approves it

Agent
Batch packet
Drafts
each held batch’s list of what is missing, with every item’s source, owner and due date
Owner
the QA manager
Measure
median days from the last test result to disposition
Approver
QA, every batch, in MasterControl
May not
write to any GMP record, or mark a batch ready to release

The measure

What we measure

Median days from the last test result to QA’s disposition in MasterControl, not days in quarantine, so the sterility test’s fixed days don’t count and the chase does. For the triage agent, the measure is deviations triaged within one shift. The same QA team does all of it.

Batch record review commonly takes about 30 days.

Source: BioPhorum, via BioPharm International; 2012