Molding and machiningAnonymizedFilm · 2 min

The machine stopped. Nobody wrote down why.

A contract manufacturer on Epicor Kinetic had MachineMetrics recording every stop on its presses and mills, but nobody picked a reason from the long list on the tablet, the paper log said maintenance and the morning meeting argued from memory. We redesigned how the floor explains and owns its stops first, with a short list of reasons the floor agreed on, planned stops split from unplanned ones and a morning meeting on yesterday’s top three losses, each with an owner, then built one agent that drafts the shift handover for the shift supervisor to approve.

Anonymized client. Figures are illustrative.

Chapters

At a glance

The situation, and what we did

Situation
A contract manufacturer with injection molding presses and CNC mills ran Epicor Kinetic for its jobs, with MachineMetrics on every press and mill recording each stop from the machine’s own signals. Nobody picked a reason from the long list on the tablet, the paper log said maintenance and the morning meeting argued from memory, so maintenance took the blame for stops that were really staffing and scheduling.
Mandate
Find out why the presses and mills stop and who owns each loss, with the machines and systems the plant already runs, so the morning meeting works from the record instead of memory.
Our role
We redesigned how the floor explains and owns its stops first, then built the shift handover agent and the approval queue into the systems the plant already runs.
What we did
Spent a week on the floor with the operators and the maintenance lead, then cut the reason codes to a short list the floor agreed on, split planned stops from unplanned ones, set MachineMetrics’ own prompt to ask about any stop over five minutes and gave the morning meeting fifteen minutes on yesterday’s top three losses, each with an owner. Then built a shift handover agent that groups the short stops, shows the shift supervisor any gap still blank, and drafts the handover note for the shift supervisor to approve and a maintenance request, when a fault repeats, for the maintenance lead to approve.

As redesigned

The redesign, process first

  1. A week on the floor with the operators and the maintenance lead, then a short list of reasons the floor agrees on.

  2. Planned stops split from unplanned ones, and any stop over five minutes gets its reason at the press, in MachineMetrics’ own prompt, while the operator still remembers.

  3. Fifteen minutes every morning on yesterday’s top three losses, each with an owner.

As built

The systems in this case

What the team runs

  • MachineMetricsMachineMetrics
  • EpicorEpicor Kinetic

What we build

  • The shift handover agent
  • The approval queue

What people read

  • Power BIPower BI, at the morning meeting

Product names and logos are trademarks of their respective owners.

The agent, and who approves it

Agent
Shift handover
Drafts
the handover note and the top-three chart; a maintenance request when a fault repeats
Owner
the plant manager
Measure
share of downtime minutes with a valid reason
Approver
the shift supervisor for the note; the maintenance lead for any request
May not
pick a reason, send or issue anything, write to Epicor Kinetic, or control a machine

The measure

What we measure

Unplanned downtime minutes per scheduled hour, the availability side of OEE, read every morning against a baseline from two weeks of machine data taken before anything changed, and, for the agent, the share of downtime minutes with a valid reason.